Bülent Tüz P.T. Studio Project

In 2020, turnkey design, 3D drawings, manufacturing drawings, manufacturing, and on-site application were completed for the 165 m2 P.T. Studio located in Bostancı. Project Duration: 20 Days.
Enpos Office Project

In 2019, the turnkey design, 3D drawings, manufacturing drawings, production, and on-site application of the 870 m2 Enpos Office Project located in Göztepe Business Istanbul were realized. Project Duration: 35 days.
Artbar Ajans Office Project

The turnkey design, 3D drawings, manufacturing drawings, manufacturing and on-site application of the 172 m2 Artbar Ajans Office Project located in Kozyatağı Yazgan Business Center was realized in 2019. Project Duration: 32 Days
Lodamaster Şerifali Office Project

The design and implementation of the Lodamaster Şerifali office located in Istanbul were completed in 2021. The project included the design of the office space, 3D drawings, construction drawings, manufacturing, and on-site implementation. Project Duration: 20 Days.
Lodamaster Gebze Factory Project

Key turn design, 3D drawings, manufacturing drawings, manufacturing, and on-site implementation for a 3000 m2 factory and 140 m2 prefab office project in Şerifali in 2018. Project duration: 45 days.
PosMedia Office Project

Key turn design, 3D drawings, manufacturing drawings, manufacturing, and on-site implementation for a 210 m2 office project in Şerifali in 2018. Project duration: 9 days.
Ankara Hotel Project

48 Rooms Boutique Hotel’s design, 3D drawings and manufacturing drawings were made.
Büyükada Hotel Project

8 Rooms Boutique Hotel’s design and 3D drawings and manufacturing drawings were made.
E.E. Karaöz Villa Project

Design, 3D drawings, production drawings, manufacturing drawings, manufacturing and on-site implementation were realized for the 135m2 villa project located in Antalya Kumluca Karaöz region. Project duration: 2 months.
T.K. Villa Project

Design, 3D drawings, production drawings, manufacturing drawings, manufacturing and on-site implementation were realized for the 142m2 villa project located in Istanbul Şile Taşevler Site area. Project duration: 2 months.