Rossmann Bakırköy Store Project

In 2016, design, 3D drawings and manufacturing drawings were made for the 350 m2 store project in Bakırköy.
Rossmann Üsküdar Store Project

In 2011, turnkey design, manufacturing and on-site implementation of the 720 m2 Store Project in Üsküdar was realized. Project Duration: 17 Days
Merika Kiosk

In 2022, the design for the Kiosk to be used in the common area of Merika Cafe in Ataşehir Metropol Shopping Mall was realized.
Tarihi Beyoğlu Kurukahvecisi

In 2016, turnkey concept design, manufacturing and on-site implementation of the Historic Beyoğlu Kurukahvecisi Cafe Project was realized in Ataşehir Watergarden Shopping Mall. Project Duration: 27 Days
Kofi Cafe Galata

In 2014, the turnkey concept design, manufacturing and on-site implementation of the Cafe located on Camekan Street in Galata Kuledibi District was realized. Project Duration: 21 Days
Sabiha Sultan Restoran

In 2017, the implementation of the synchronous interior design project to the restoration project of the Seljuk Period 13th Century Sultan Bath in Kayseri. The lighting, furniture and all furnishing elements of the space were designed and implemented. Project Duration: 4 Months
Taps Restoran

Between 2008 and 2010, project implementations were realized with Balıklı Mimarlık company in Asmalı Mescit 560 m2 Suadiye 430m2 Kentplus 360 m2 Hillside Trio 45m2 Project implementations were carried out at its branches.
N.S. Psychology Clinic Project

Design and 3D drawings, as well as manufacturing drawings, were completed for a 146 m2 clinic space located in Maltepe Ritim Istanbul in 2022.
Voice360 Ajans

Key turn design, 3D drawings, manufacturing drawings, manufacturing, and on-site implementation for a 350 m2 office project in Ataşehir Metropol Plaza in 2022. Project duration: 2 months.
Zem Shelf Factory

Design and 3D drawings as well as manufacturing drawings were made for the 275 m2 office area of the factory located in Gebze in 2022.